Routine repairs
Change the status (resolve, close)
Move a routine repair through its life cycle (Reported, Assigned, In progress, Resolved, Closed).
- Audience
- Administrator or assigned person
- Screen
- Detail → Information (edit) → Status
- Verified version
- App 1.0.0
Goal
Move a routine repair forward through its life cycle: Reported → Assigned → In progress → Resolved → Closed.
Audience
Administrator or the assigned person.
Prerequisites
Steps
-
In edit mode, open the "Status" menu and choose the next status.

-
To resolve, switch to Resolved and fill in the Resolution note and Actual cost ($) as needed.
-
Click "Save". The change is logged in the History tab.
'Closed' is terminal
Once Closed, the repair can no longer change status normally: reopening it requires an admin correction (see Force a closed status).
Tips and common errors
- Validated transitions: the state machine guides the status order; a disallowed status is not offered (except admin override).
- Resolution note: documents what was done; useful for auditing and the contingency fund.
